Wind Systems Magazine

February 7, 2012

Share

RELATED ARTICLES

CONSTRUCTION

Performed properly, a mat foundation bearing on aggregate...

 

CONSTRUCTION

Compaction grouting is the only soil improvement technique...

 

CONSTRUCTION

When conducting site remediation, jet grouting is one...

 

CONSTRUCTION

Mass stabilization is a soil mixing technology for treating...

 

CONSTRUCTION

A proven technique for correcting settlement, soil fracture...

 

CONSTRUCTION

When the upper soil structure is too weak to support a wind...

 

CONSTRUCTION

Soil mixing is an economical and efficient alternative to...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

Providing Concrete Evidence

A new telescopic truck-mounted conveyor belt system from...

 

CONSTRUCTION

Used successfully on many types of structures, including...

 

CONSTRUCTION

When the upper soil structure is too weak to support a wind...

 

CONSTRUCTION

When performed properly, vibro compaction is an efficient...

 

CONSTRUCTION

Densification of loose material prior to tower construction...

 

CONSTRUCTION

Used successfully on many types of structures, including...

 

Innovative Turbine Foundation Solutions

The Rammed Aggregate Pier system, designed by the Geopier...

 

Concrete Proof: The Majestic Wind Farm

By using the Putzmeister Telebelt conveyor to transport...

 

CONSTRUCTION

No structure can remain standing without a solid...

 

Construction Profile: Geopier Foundation Co.

Whether strengthening access roads or the soil beneath...

 

Vibration-Based Wind Tower Foundation Design

Wind towers must sustain continuous vibration-induced...

 

CONSTRUCTION

Compaction grouting is the only soil improvement technique...

 

CONSTRUCTION

Mass stabilization is a soil mixing technology for treating...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

CONSTRUCTION

No structure can remain standing without a solid...

 

CONSTRUCTION

Compaction grouting is the only soil improvement technique...

 

CONSTRUCTION

No structure can remain standing without a solid...

 

Concrete Proof: The Majestic Wind Farm

By using the Putzmeister Telebelt conveyor to transport...

 

CONSTRUCTION

Micropiles are versatile enough to function either as a new...

 

CONSTRUCTION

Both wind and weight create tremendous forces on tower...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

CONSTRUCTION

When performed properly, vibro compaction is an efficient...

 

Torque Certification Marks Maintenance Advances

As the U.S. wind industry gains momentum, torque training...

 

CONSTRUCTION

When the upper soil structure is too weak to support a wind...

 

CONSTRUCTION

Soil mixing is an economical and efficient alternative to...

 

CONSTRUCTION

Densification of loose material prior to tower construction...

 

Vibration-Based Wind Tower Foundation Design

Wind towers must sustain continuous vibration-induced...

 

Archives > August 2010 > CONSTRUCTION

CONSTRUCTION

By: Eric Drooff

 

Consisting of concrete columns installed through weak compressible strata, rigid inclusions use upper strong strata to transfer the load to the inclusions.

 

Planned wind tower sites may appear firm on the surface, only to conceal a buried weak soil stratum. Depending on the depth and thickness of the weak layer, it may provide the planned tower with insufficient bearing capacity or be the cause of excessive settlement. When a weak layer is discovered prior to construction the foundation designer has several options including excavating and replacing the soil, bypassing the weak layer with a deep foundation, or improving the characteristics of the soil in situ. “Rigid inclusions” is a ground reinforcement process that transfers loads through weak stratum to firm underlying stratum, improving the weak layer’s load bearing and settlement characteristics.

Rigid inclusions consist of concrete columns installed through weak compressible strata, using upper strong strata to transfer the load to the inclusions. A closed-end pipe is advanced to a designed depth into underlying firm soils. The pipe is then filled with a concrete mix with a high internal friction. The inclusion is then constructed as the concrete fills the void created as the pipe is extracted. Construction sequence is important to avoid damaging previously constructed inclusions that are still curing.

As with the construction of any tower project, preliminary planning must include a geotechnical engineering exploration. The geotechnical report should include an evaluation of the site geological history, soil engineering properties (including density, gradation, and moisture content), and the in situ strength and compressibility characteristics of each stratum within the influence of the planned foundation. Location and information about adjacent structures and utilities should be included.

Rigid inclusions transfer the majority of the load from above the problem soil to below it. The weak stratum thereby experiences little additional load, and therefore has minimal influence on the tower’s settlement or bearing capacity. The lengths of the rigid inclusions extending into the firm soils above and below the weak stratum are designed to achieve the required load transfer. When the top of the weak stratum is at or near the foundation bearing elevation, a load transfer platform may be required. This often consists of a geogrid reinforced soil layer that acts as a mat to distribute the foundation loads to the inclusions and provide a more uniform bearing support for the foundation.  At sites where fill placement is required to raise the site grade, it may be feasible to construct this relieving platform within the fill.

Although the inclusions may have the appearance of piling, there are many differences. One obvious difference is that the inclusion is not connected to the structure. The structure is directly supported by upper soils, which transfer load to the rigid inclusions. The rigid inclusions transfer the stress from the bearing soils past problem soils and into underlying firm soils. Another distinction is that the inclusions seldom require significant reinforcing steel. However, steel reinforcement is common in the upper portion of the inclusion to avoid damage due to construction of adjacent inclusions or loads from construction equipment.

The diameter and spacing of rigid inclusions varies depending on the loading, concrete strength, and subsurface conditions. Typical spacing ranges from 6-10 ft. During construction of the inclusion, the concrete is not pressurized above the fluid pressure of the concrete itself. Quality control measures include: 1) procedural inspection and documentation of the work activity; 2) testing to ensure proper mix design; 3) monitoring of concrete injection volume, and; 4) strength testing of concrete test cylinders cast during construction. Industry standards now enable owners and engineers to require computerized data acquisition systems to record construction parameters in real time. These systems will document the depth and verticality of the inclusion, the penetration time and resistance (to verify sufficient penetration into bearing stratum), and the volume of concrete. Real-time monitoring and recording of these parameters allow the operator to make necessary adjustments during construction and provide the engineer with documentation that the construction was performed properly.

When applied properly, rigid inclusions can provide the necessary ground improvement for many wind turbine sites, allowing for a shallow foundation system. In most cases, mat foundations constructed on improved soil will provide an economic advantage over deep foundation options. 

 

 

About The Author
Eric Drooff

 is a senior vice president for Hayward Baker, Inc., the leading specialty foundation and ground improvement contractor. He can be reached at erdrooff@haywardbaker.com. Go online to www.haywardbaker.com.

 

 