Wind Systems Magazine

February 7, 2012

Share

RELATED ARTICLES

MAINTENANCE

In order to increase reliability and service life, there...

 

The Mobile Age of Service Technology

Like it or not the mobile age is here, and wind turbine...

 

TECHNOLOGY

Wind turbine blades are growing larger, so research must be...

 

Condition Based Turbine Maintenance

Whether it’s new or an existing installation,...

 

Twisting in the Warranty Winds

Understanding and managing wind turbine warranty exposure...

 

Company Profile: NRG Systems, Inc.

You can’t just talk the talk, you’ve got to walk it as...

 

Remote Condition Management

Not only does the CMaS system from Moventas gather critical...

 

Optical Ice Sensors for Wind Turbine Nacelles

New optical technology borrowed from the communications...

 

MAINTENANCE

Pre-end of warranty inspections assess the service history...

 

Raising Generator Reliability

By implementing proper maintenance procedures you can...

 

A New Phase in Turbine Condition Monitoring

If gearbox issues and turbine loading have got you down,...

 

MAINTENANCE

If you see to the little things, the big things will take...

 

Brushing Up on Turbine Generator Maintenance

New designs and materials are leading to longer brush life...

 

TECHNOLOGY

Turbine icing is an increasing challenge to the economics...

 

Company Profile: NRG Systems, Inc.

You can’t just talk the talk, you’ve got to walk it as...

 

Maintenance Profile: Eaton Corporation

From maintenance services, to turnkey substation...

 

Remote Condition Management

Not only does the CMaS system from Moventas gather critical...

 

Creative Condition Monitoring

Condition monitoring systems that monitor key components of...

 

TECHNOLOGY

Next-generation wind turbines will be smarter, more...

 

Brushing Up on Turbine Generator Maintenance

New designs and materials are leading to longer brush life...

 

Creative Condition Monitoring

Condition monitoring systems that monitor key components of...

 

Improving Turbine Performance

In a perfect instance of technology transfer, improvements...

 

Conquering Turbine Shaft Alignment

The truer the shaft alignment, the lower the maintenance...

 

MAINTENANCE

Remote monitoring allows Q&M professionals to check turbine...

 

Maintenance Profile: Eaton Corporation

From maintenance services, to turnkey substation...

 

Raising Generator Reliability

By implementing proper maintenance procedures you can...

 

MAINTENANCE

Remote monitoring allows Q&M professionals to check turbine...

 

MAINTENANCE

The best way to avoid turbine downtime is to follow quality...

 

Managing Wind Station Warranties

When a warranty expires, responsibility for future repairs...

 

Thinking Outside the Gearbox

Even though gearbox design has improved over the years,...

 

MAINTENANCE

Ideally, gearboxes would run forever with no downtime, but...

 

A Strategic Approach to Successful O&M

To maximize efficiency the need for a component repair or...

 

MAINTENANCE

The worldwide growth of the wind industry, in addition to...

 

The Future of Wind Turbine Diagnostics

As wind turbines increase in size, and their operating...

 

Archives > September 2009 > MAINTENANCE

MAINTENANCE

By: V. Anton Soldo, Sumit Singhal & Garnik Haghverdi

 

The generator is the heart of the windmill power generation system, so developing an ongoing maintenance program will help protect your investment.

 

With the increasing investment into the development of wind farms, preventive maintenance takes on an important role in ensuring the reliability and cost-effectiveness of this energy business. The reliable operation of the drive train requires the preventive maintenance of key components such as generators and gearboxes. The generator is the heart of the windmill power generation system, as it converts mechanical energy to usable electrical energy. A catastrophic failure of the generator will lead to a complete shut down of the windmill for several days, which results in expensive repairs and lost revenues. This can significantly affect the bottom line financial results. Among the several failure modes that may cause generator failure, the most frustrating and time consuming is a premature bearing failure. Although the cost of bearings is a small portion of the generator cost, its premature failure can cause catastrophic equipment damage and expensive downtime. A bearing replacement process in a wind generator is a complex and expensive process as the generator is housed in a nacelle. The typical cost for a bearing replacement in the field for a 1.5 MW wind generator may run in excess of $25,000 to $75,000, depending upon the location and the accessibility to the nacelle.

It has been observed from field experience that improper greasing, misalignment in the drive train, and shaft current are among the major causes of premature bearing failure in generators. There are several different improper greasing practices that occur: under-greasing, over-greasing, or the use of a grease type other than that recommended by the generator manufacturer. Bearing seizure can occur due to lack of lubrication if enough grease is not supplied to the bearings. Over-greasing of bearings may lead to excessive heat generation inside the bearing, which can lead to uneven thermal expansion of rollers and race causing a catastrophic bearing seizure. Some manufacturers supply generators with automatic greasing units to ensure the correct amount of grease is applied. Another common mode of premature bearing failure is Electrical Discharge Machining (EDM), which is caused by a passage of current through the bearings. This damaging flow of current can be prevented by insulating the bearings. Ground brushes are used in conjunction with insulated bearings to safely discharge the potential that otherwise discharges through bearings and damages the bearing insulation. It has been frequently observed from field repair experience that EDM bearing damage is often caused by improper installation or the mechanical wear of the ground brush on the machine.

Premature catastrophic bearing failure can also be caused by a high degree of misalignment between the gearbox and the generator. Misalignment in the coupling between the gearbox and generator leads to additional axial, radial, and angular forces on the generator bearings that reduce the bearing’s life, and in extreme cases results in failure. Implementing robust preventive maintenance programs and installing continuous condition monitoring systems on the generator can help avoiding premature bearing failure modes. A preventive maintenance program for generator bearings requires some key information, such as re-greasing intervals and the expected life of the bearings and ground brushes. In order to develop and implement a robust preventive maintenance program for wind farms, end users should consult their OEM for key information and technical expertise. Skilled technicians and manufacturer information are equally important for executing a successful program. Installing sensors such as accelerometers, shock pulse measurement (SPM) systems to monitor machine vibration, and thermocouples to monitor bearing temperature can prevent expensive equipment damage. Although these condition monitoring sensors can’t prevent bearing failures, they can provide early warning signals to prevent catastrophic equipment damage. It is imperative to store and compare sensor data regularly to perform trend analysis to predict bearing and equipment health.

Additionally, it is important to understand that proper training and knowledge is required to interpret critical vibration and temperature signals in order to make key decisions about the repair and maintenance. Although the initial cost of implementing and running preventive maintenance and continuous monitoring system program in the wind farm may seem expensive, most companies recognize the return on investment through reduced downtime and extended equipment life of the wind turbines.

 

 

About The Authors
Sumit Singhal

Sumit Singhal is senior product engineer at Siemens Energy & Automation. Go to www.siemens.com.

 
Garnik Haghverdi

is senior field service technician at Siemens Energy & Automation. Go to www.siemens.com

 
V. Anton Soldo

is service manager, generator, at Loher GmbH, a Siemens company. Go to www.siemens.com and www.loher.com

 

 

Wind Systems is a trademark of Media Solutions, Inc, copyright 2002-2010.

Wind Systems and all contents are properties of Media Solutions, Inc.