Siemens Gamesa to supply 166 MW at four new wind farms

4855

Siemens Gamesa Renewable Energy has entered into new agreements with Gas Natural Fenosa Renovables for the supply of 166 MW at four wind farm developments in Spain. These projects fall under the scope of the renewable capacity allocated to the Spanish utility as part of the auction held last May.

Specifically, Siemens Gamesa will commission a total of 48 of one of its most popular turbines, the SG 3.4-132, thus installing 166 MW of capacity. The company will also operate and maintain these four wind farms, which are due to be commissioned in mid-2019, for three years.

Siemens Gamesa will install 48 of one of its best-selling models, the SG 3.4-132. (Courtesy: Siemens Gamesa)

The blades for these turbines will be made at the Aoiz factory (Navarre, Spain) and the Tangier factory (Morocco), while the nacelles will be produced at the Ágreda facility (Soria, Spain).

Siemens Gamesa’s relationship with Gas Natural Fenosa dates back to 1997, since which time the company has supplied the Spanish utility with more than 670 MW, most of which is in Spain and Mexico.

Source: Siemens Gamesa

For more information, go to www.siemensgamesa.com